Don’t Be Caught in an Extended Forced Outage
Market Operators are Demanding Reliable Gas Turbine Startups
The ISOs are enacting huge penalties if GTs don’t start when called — it’s more important than ever because of renewables. GT Startup System
Controls must be reliable.
The Solution and ROI can be as little as One Day of Forced Outage
The good news is there’s a simple solution. Upgrade the Load Commutated Inverter (LCI) static starting system. By bringing the startup system into the 21st century, the gas turbine predicted start reliability increases dramatically – this low cost ‘insurance policy’ against failed starts gives owners and operators peace of mind that they can avoid lost revenue and massive penalties from the market operators.
Click here to watch the recorded session.